Files
ruvnet--RuView/docs
ruv 192b4c6b4a fix(ruview-gamma): safety becomes a property of construction (safety review, 2 critical + 3 major)
- safety stop is now control flow: run_calibration terminates the sweep on
  any stop (partial calibration recorded)
- cross-session terminate-and-lock: persisted latched ParticipantSafetyState;
  locked participants refuse sessions across governor instances until
  unlock_with_acknowledgment writes an audit record; documented class->lock map
- SafetyEnvelope safe-by-construction: private fields, validated try_new/with_*
  constructors, serde routed through the validator, compiled-in absolute bounds
  (floor >=30Hz keeps the whole band above the 15-25Hz photosensitive zone;
  caps <=0.6; <=30min) — an 18-22Hz config fails to deserialize
- dose governance: <=4 sittings/24h + >=60min cooldown from the persisted ledger
- per-tick latched SafetyMonitor wired into run_session (simulator emits ticks;
  mid-session latch truncates delivered duration); clean-session witness
  byte-identical (pinned proof unchanged)
- cohort warm-start k-floor (>=3 profiles)
ADR-250 + crate README updated. 125+13 tests green.

Co-Authored-By: claude-flow <ruv@ruv.net>
2026-06-11 15:26:17 -04:00
..