Terminal output of the SOTA research loop. Maps every research finding
to owner, LOC estimate, dependency, and priority across 6 tiers.

Total engineering budget across the loop's output:
- Tier 1 (Q3 2026):     ~490 LOC, 3-4 person-weeks
- Tier 2 (Q3-Q4 2026): ~1180 LOC, 6-8 person-weeks
- Tier 3 (2027):       ~1140 LOC, 8-10 person-weeks
- Tier 4-5 (long horizon): ~700+ LOC, 6-8 person-weeks
- TOTAL:               ~3,500 LOC, ~25 person-weeks

Tier 1 (next quarter) ships:
- 1.1 wifi-densepose plan-antennas CLI tool (360 LOC) -- 93x placement lift
- 1.2 R12.1 pose-PABS in vital_signs cog (80 LOC) -- 9.36x intruder lift
- 1.3 cog-person-count v0.0.3 chest-centric (50 LOC)
- 1.4 ADR-029 amendment w/ ADR-113 matrix (0 LOC)

Critical-path graph:
1.1 + 1.2 -> 1.3 -> 2.1 ruview-fed -> 2.2 DP-vital-signs -> 3.1 cross-install -> 3.2 PQC
                                  +-> 3.3 real-AETHER -> 3.4 fall-detect
                                                       +-> 4.x verticals

Why this matters: after 35 ticks of research output, this is the
document that lets a team pick up and ship without re-reading the 34
research notes. Priority alignment, estimate-anchoring, critical-path
visibility — all in one place.

R-thread mapping:
- R5/R6/R6.2 family/R6.1 -> Tier 1
- R12/R12.1 PABS -> Tier 1.2
- R3/R3.1/R3.2/R14/R15 -> Tier 2-3
- R7 mincut -> Tier 2 (in ruview-fed)
- R13 NEGATIVE -> rules out BP, no Tier line
- R10/R11/R16/R17/R18 verticals -> Tier 4-5

Composes with every loop output. Every thread, ADR, vertical sketch
has a line in some Tier. The TERMINAL output that needs the synthesis
power of a research loop to produce.

Honest scope:
- Estimates synthetic-data-based; may shift after bench validation
- Critical-path may have hidden dependencies (e.g. AgentDB schema)
- 25 person-weeks assumes full-time engineers
- Doesn't include integration testing, documentation, deployment ops
- Tiers based on architectural dependency, not business priority

Loop status after 35 ticks:
- 16 research threads
- 6 exotic verticals
- 6 new ADRs (105/106/107/108/109/113)
- 3 negative result categories
- 2 self-corrections
- 3 honest-scope findings
- 9-tick R6 family (complete)
- 3-tick R3 arc (complete)
- 3-tick R12 arc (complete)
- This production roadmap

00-summary.md will follow at 12:00 UTC / 08:00 ET cron stop.

Coordination: ticks/tick-35.md, no PROGRESS.md edit.
2026-05-22 07:00:31 -04:00

102 lines
3.9 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Tick 35 — 2026-05-22 10:55 UTC
**Thread:** Production roadmap synthesis
**Verdict:** Terminal output of the loop. Maps every research finding to owner / LOC / dependency / priority. Total budget: **~3,500 LOC, ~25 person-weeks**.
## What shipped
- `docs/research/sota-2026-05-22/PRODUCTION-ROADMAP.md` — 6-tier roadmap from loop output to shipped product.
## Headline budget breakdown
| Tier | Timeline | LOC | Person-weeks |
|---|---|---:|---:|
| Tier 1 | Q3 2026 (next quarter) | ~490 | 3-4 |
| Tier 2 | Q3-Q4 2026 | ~1180 | 6-8 |
| Tier 3 | 2027 | ~1140 | 8-10 |
| Tier 4-5 | long horizon | ~700+ | 6-8 |
| **Total** | | **~3,500** | **~25 weeks** |
## Tier 1 (Q3 2026) — 4 items
| # | Item | LOC | Priority |
|---|---|---:|---|
| 1.1 | `wifi-densepose plan-antennas` CLI tool | 360 | HIGH |
| 1.2 | R12.1 pose-PABS in vital_signs cog | 80 | HIGH |
| 1.3 | cog-person-count v0.0.3 chest-centric | 50 | HIGH |
| 1.4 | ADR-029 amendment w/ ADR-113 matrix | 0 | HIGH |
Tier 1 alone delivers: 93× placement-coverage lift, 9.36× intruder-detection lift, ADR-029 closed.
## Tier 2 (Q3-Q4 2026) — 4 items
`ruview-fed` crate (800 LOC), cog-vital-signs DP (120), bench validation (200), MCP placement tool (60).
## Tier 3 (2027) — 4 items
Cross-install fed (530), PQC Phase 1 (490), real-AETHER + R3.2 (200), cog-fall-detection (200).
## Tier 4-5 — long horizon
- 4.x: PQC Phase 2, R10 wildlife cog, R11 maritime cog, R6.1 production
- 5.x: Real RCS measurements, weather-affected propagation, fatigue cog, disaster-fed ethics
## Critical-path graph
```
1.1 CLI ──┬──> 1.3 person-count v0.0.3 ──┬──> 2.1 ruview-fed ──> 2.2 DP-VS ──> 3.1 X-install ──> 3.2 PQC
1.2 R12.1─┘ │ │
└──> 3.3 real-AETHER ──> 3.4 fall │
4.x verticals
```
## Why this document matters
After 35 ticks of research output, this is the document that lets a team **pick up and ship** without re-reading the 34 research notes. Priority alignment, estimate-anchoring, critical-path visibility — all in one place.
## What R-numbered threads ship in what tier
| Threads | Tier |
|---|---|
| R5 / R6 / R6.2 family / R6.1 | Tier 1 (placement + PABS) |
| R12 / R12.1 PABS | Tier 1.2 |
| R3 / R3.1 / R3.2 / R14 / R15 | Tier 2-3 (privacy + federation) |
| R7 mincut | Tier 2 (in ruview-fed) |
| R13 NEGATIVE | rules out BP cog, no Tier line |
| R10 wildlife | Tier 4.2 |
| R11 maritime | Tier 4.3 |
| R16/R17/R18 verticals | Tier 4-5 |
## Composes with every loop output
Every loop thread, ADR, vertical sketch has a line in some Tier above. This is the **terminal output** of the loop — the last document that needs the synthesis power of a research loop to produce.
## Honest scope of the roadmap itself
- Estimates are synthetic-data-based; may shift after bench validation
- Critical-path may have hidden dependencies (e.g. AgentDB schema changes)
- 25 person-weeks assumes full-time engineers, not split focus
- Doesn't include integration testing, documentation, deployment ops time
- Tiers are based on architectural dependency, not business priority
## Coordination
`ticks/tick-35.md`. No PROGRESS.md edit. Branch `research/sota-production-roadmap`.
## Loop status approaching completion
~1.1h to cron stop. After 35 ticks the loop has produced:
- 16 research threads (R1, R3, R5-R15, R16, R17, R18)
- 6 exotic verticals (wildlife, maritime, empathic, healthcare, industrial, disaster)
- 6 new ADRs (105, 106, 107, 108, 109, 113)
- 3 negative result categories
- 2 self-corrections
- 3 honest-scope findings
- 9-tick R6 placement family (complete)
- 3-tick R3 cross-room re-ID arc (complete)
- 3-tick R12 structure detection arc (complete)
- This production roadmap synthesis
The 00-summary.md (final tick) will follow after the 12:00 UTC / 08:00 ET cron stop.